One of the first projects we undertook was adding a new first floor bathroom. The original bathroom was constructed in the 1970’s and had no period appeal. What it did have was a leaking toilet, outdated fixtures and peeling flooring and wallboard. It was situated in an awkward location between the dining room and kitchen and was in tough shape so we all agreed that getting a new bathroom in was priority #1. We had to upgrade the plumbing and electrical and design it in a new location – in an old room in the main house that needed a ton of work.

New bathroom plan
New bathroom plan
Back Room
Room next to kitchen in which new bathroom will go (Nov 2013)
20140722_103556
New tiled shower
IMG_5373
Finished bathroom (Sept 2014)
Advertisements